Improved Construction Method - Company Ranking(5 companies in total)
Last Updated: Aggregation Period:Dec 10, 2025〜Jan 06, 2026
This ranking is based on the number of page views on our site.
Display Company Information
| Company Name | Featured Products | ||
|---|---|---|---|
| Product Image, Product Name, Price Range | overview | Application/Performance example | |
| ■Various Experts in Different Fields Our company has a range of experts, including first-class architects with extensive experience, special... | 【Main Clients】 ▼Government Agencies Ministry of Land, Infrastructure, Transport and Tourism Kanto Regional Development Bureau Ministry of La... | ||
| 【Features of Teratec Construction Method】 ■ Does not interrupt operations ■ Does not damage the floor ■ Short construction period ■ Patent o... | **Main Construction Sites** Stores: Shopping centers, large retail stores, convenience stores, pachinko parlors, restaurants Warehouses:... | ||
| 【Construction Conditions】 ■Applicable Foundation Shape: All direct foundations ■Construction Depth: 10m ■Distance Limit from Adjacent Land: ... | 【Purpose】 ■Ground improvement directly beneath the building *For more details, please refer to the PDF document or feel free to contact us.... | ||
|
---
--- |
--- | ||
-
- Featured Products
-
Achieve a "smooth floor" in an auto repair shop in just one day! Measures against floor sinking and unevenness.
- overview
- ■Various Experts in Different Fields Our company has a range of experts, including first-class architects with extensive experience, special...
- Application/Performance example
- 【Main Clients】 ▼Government Agencies Ministry of Land, Infrastructure, Transport and Tourism Kanto Regional Development Bureau Ministry of La...
Measures against management risks! Prevention of worsening tilt and hollowing out 'TerraTech Method'
- overview
- 【Features of Teratec Construction Method】 ■ Does not interrupt operations ■ Does not damage the floor ■ Short construction period ■ Patent o...
- Application/Performance example
- **Main Construction Sites** Stores: Shopping centers, large retail stores, convenience stores, pachinko parlors, restaurants Warehouses:...
"Ground Improvement" "GSIS Method" Ground improvement directly beneath the building.
- overview
- 【Construction Conditions】 ■Applicable Foundation Shape: All direct foundations ■Construction Depth: 10m ■Distance Limit from Adjacent Land: ...
- Application/Performance example
- 【Purpose】 ■Ground improvement directly beneath the building *For more details, please refer to the PDF document or feel free to contact us....
-
Membership (free) is required to view all content.
Already a Member? Log In Here
メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡